Implementasi Active Directory Singgle Domain pada Anak Perusahan Akita Jaya Mobilindo Jakarta

Authors

  • Ahmad Rais Ruli Akademi Manajemen Informatika dan Komputer Bina Sarana Informatika (BSI)

Keywords:

active directory, domain and Windows Server

Abstract

In globalization of technology, it's easy and faster to process the data. One of data processing that allows and makes easy the administrator on the processing of access rights is Active Directory. Users can be controlled on the access rights of data application with the implementation of Active Directory. The administrator can give the access rights of local data application and local exchange access. Akita Jaya Mobilindo is an automotive company where the subsidiaries locate in JABODETABEK area. This reason, the processing data of this corporate uses the centralize of data where it can be accessed by user in all the corporate branches, therefore, implementation of single domain is the right choosen as a solution that is faced by administrator. Active directory makes easier on the controlling and managing of data access that it will be provided to the users.

Downloads

Download data is not yet available.

Author Biography

Ahmad Rais Ruli, Akademi Manajemen Informatika dan Komputer Bina Sarana Informatika (BSI)

Department of Informatic Engineering

References

[1] _______, "Rencana Usaha Penyediaan TenagaListrik (RUPTL) PT. PLN (Persero) Tahun 2016 " 2025 ”, Kementerian ESDM, Jakarta, 2016.

[2] PT. PLN (Persero), "Statistik PLN 2014”, Jakarta, 2014.

[3] IEA/ NEA, "Current Status. Technical Feasibility and Economics of Small Nuclear Reactors”, OECD, Paris, Juni 2011.

[4] LOCATELLI, G. & MANCINI, M.,”Small"medium Sized Nuclear, Coal and Gas power plant: A Probabilistic Analysis of Their Performances and Influence of CO2 Cost”, Energy Policy, 38,6360"6374, 2010.

[5] _______, "Peraturan Pemerintah Republik Indonesia No. 79 Tahun 2014 Tentang Kebijakan Energi Nasional”, Jakarta, 17 Oktober 2014.

[6] RODE, at al,”Montecarlo Methods for Appraisal and Valuation: A Case Study of a Nuclear Power Plant”, CEIC Working Paper 01"01, Carnegie Mellon Electricity Industry Center, Carnegie Mellon University, Pittsburgh, 2001.

[7] Nuryanti, et al,”Analisis Kelayakan Finansial Proyek PLTN SMR di Indonesia dengan Mempertimbangkan Variabel Ketidakpastian”, Jurnal Pengembangan Energi Nuklir Volume 17, Nomor 2, Desember 2015.

[8] ROTHWELL, "The Economics of Future Nuclear Power: An Update of The Economic Future of Nuclear Power (2004), a Study Conducted at the University of Chicago”, Stanford University, 2011.

[9] SOEHARTO, I., "Studi Kelayakan Proyek”, Penerbit Erlangga, Jakarta, 2002.

[10] SRIDADI, B.,”Pemodelan dan Simulasi Sistem: Teori, Aplikasi dan Contoh Program dalam Bahasa C”, Penerbit Informatika, 2009.

[11] BLANK & TARQUIN, "Engineering Economy”, 6th, Mc Graw Hill, Singapore, 2008.

[12] PERMATASARI, K.,”Analisis Kelayakan Proyek Pembangunan Pembangkit Listrik Tenaga Panas Bumi oleh Pengembang Panas Bumi di Indonesia”, Skripsi, Jakarta: Program Studi Teknik Industri Universitas Indonesia, 2010.

[13] MARTLAND, Carl D.,”Project Evaluation Choosing a Discount Rate”, http://ocw.mit.edu/courses/civil-and-environme ntal-engineering/1-011-projectEvaluation-sprin g-2011/lecture-notes/MIT1_011S11_lec06.pdf, diakses 26 Maret 2012.

[14] PT PLN (Persero), PT LAPI ITB & JAPC,”Feasibility Study for Bangka Nuclear Power Plant Project – Non Site aspect”, 2013.

[15] ROTHWELL, G. & GANDA, F., "Electricity Generating Portfolios with Small Modular Reactors”, Argonne National Laboratory, May 2014.

[16] BANK INDONESIA, "Foreign Exchange Rate in Year 2013”, http://www.bi.go.id/.Diakses 01 Juni 2014.

[17] OECD,”Commercial Interest Reference Rate (CIRRs)”, www.oecd.org/tad/xcred/cirrs.pdf. Diakses 01 Juni 2014.

[18] _______, "UU No 36 tahun 2008 Tentang Perubahan Keempat Atas UU No. 7 Tahun 1983 Tentang Pajak Penghasilan”, Kementerian Hukum & HAM, 2008.

[19] _______, ”CPI Inflation Calculator”, http://data.bls.gov/cgi"bin/cpicalc.pl. Diakses 03 Juli 2015.

[20] _______, "Indeks Harga Konsumen dan Inflasi Bulanan Indonesia, 2005-2015”, http://www.bps.go.id/linkTabelStatis/view/id/907. Diakses 03 Juli 2015.

[21] ABDULLA, A. & AZEVEDO, I. L., "Developing a Range of Levelized Cost Estimates for Integral Light Water Small Modular Reactor”, www.andrew.cmu.edu. Diakses Mei 2014.

[22] US DEPARTMENT OF ENERGY, "SMR Financing and Economics, The Nuclear Option: Is Small Scale Nuclear Energy an Option for Alaska?”, December 2010.

[23] ONO, K., "Generation IV International Forum Economics Assessment Methodology and Application”, GIF-INPRO Interface Meeting, Vienna, March 1, 2013.

[24] KESDM,”Peraturan Menteri ESDM No. 3 Tahun 2015”, Jakarta, 2015.

[25] _______, LIBOR yearly, http://www.moneycafe.com/personal-finance/libor/ LIBOR Source: Fannie Mae, British Bankers' Association.

[26] _______,https://www.iaea.org/PRIS/CountryStatistics/.

[27] PLN Litbang & P2EN, "Study Ekonomi, Pendanaan dan Struktur Owner Dalam Rangka Rencana Persiapan Pembangunan PLTN Pertama di Indonesia”, Jakarta, 2006.

Published

2017-11-24

How to Cite

Ruli, A. R. (2017). Implementasi Active Directory Singgle Domain pada Anak Perusahan Akita Jaya Mobilindo Jakarta. Prosiding Seminar Nasional Teknoka, 2, I103 - I108. Retrieved from https://journal.uhamka.ac.id/index.php/teknoka/article/view/766