Analysis Of Overall Equipment Effectiveness (Oee) And Determining Six Big Losses To Increase The Effectiveness Of Lb 02 Lath

Authors

  • Helena Sitorus Universitas Bhayangkara Jakarta Raya
  • Zulkani Sinaga Universitas Bhayangkara Jakarta Raya
  • Syaiful Islam Universitas Bhayangkara Jakarta Raya

DOI:

https://doi.org/10.22236/metalik.v1i2.10159

Keywords:

Overall Equipment Effectiveness (OEE), Six Big Losses, Breakdown

Abstract

Breakdown is one of the problems faced by the manufacturing company PT. Bakrie Autoparts which is engaged in the Disc Brake automotive component industry for four or more wheeled vehicles. There was a breakdown on the LB 02 lathe an average of 42.5 hours per month that exceeded the tolerance limit determined by the company which is 25 hours per mont causing the production target not to be achieved. Based on this, research is carried out which aims to calculate the Overall Equipment Effectiveness (OEE) value, determine the most dominant type of Six Big Losses, and provide suggestions for improvement efforts to increase the effectiveness of the LB 02 lathe. The results showed the average value of Overall Equipment Effectiveness ( OEE) lathe LB 02, which is 81.43%, then this value is included in the moderate condition which includes an availability rate of 86.80%, a performance rate of 94.15%, a quality rate of 99.70%. Equipment Failure Losss is the most dominant in influencing the decrease in the effectiveness of the LB 02 lathe with an average value of 8.40% with an influence percentage of 46.41%. Proposed improvements include checking the source and supply voltage every day before starting the production process, checking and replacing engine parts, especially belts once a week and every 3 months for replacement, and checking the condition of lubricating oil and coolant every day after the production process.

Keywords: Overall Equipment Effectiveness (OEE), Six Big Losses, Breakdown.

 

Downloads

Download data is not yet available.

Author Biographies

Zulkani Sinaga, Universitas Bhayangkara Jakarta Raya

Engineering Faculty

Syaiful Islam, Universitas Bhayangkara Jakarta Raya

Engineering Faculty

References

Almeanazel, O. T. (2010). Total Productive Maintenance Review and Overall Equipment Effectiveness

Measurement. Jordan Journal of Mechanical and Industrial Engineering, 15 (4), 245-250.

Ansori, Nachnul, & Mustajib, I. (2013). Sistem Perawatan Terpadu (Integrated Maintenance System). Edisi

Pertama. Cetakan Pertama. Yogyakarta: Graha Ilmu.

Honey, G. (2012). Operational Efficiency and Effectiveness Measurement. International Journal of

Operations & Production Management, 21(11), 1404-1416.

Hasriyono, M. (2009). Evaluasi Efektivitas Mesin dengan Penerapan Total Produstive Maintenance Di PT.

Hadi Baru. Medan : Universitas Sumatra Utara.

Kurniawan, F. (2013). Manajemen Perawatan Industri Teknik dan Aplikasi. Yogyakarta : Graha Ilmu

Madanhire, I., & Mbohwa, C. (2015). Implementing Successful Total Productive Maintenance ( TPM ) in a

Manufacturing Plant. Proceedings of The World Congress on Engineering, (Vol. II). London, U.K.

Moballeghi, M. (2014). Total Quality Management (TQM) Implementation in Automotive Industry: A Case Study of Selected firms in India

Moenir, HAS. (2006). Manajemen Umum di Indonesia. Jakarta: PT. Bumi Aksara.

Oktaria, S. (2011). Perhitungan dan Analisa Nilai Overall Equipment Effectiveness (OEE) pada Proses Awal Pengolahan Kelapa Sawit (Studi Kasus : PT. X). Universitas Indonesia.

O’Brien, M. (2015). TPM & OEE, Limerick: University of Limerick

Saiful, Rapi, A., & Novawanda, O. (2014). Pengukuran Kinerja Mesin Defekator I dengan Menggunakan Metode Overall Equipment Effectiveness (Studi Kasus pada PT. Perkebunan XY).

Seth, D., & Tripathi, D. (2013). Relationship Between TQM and TPM Implementation Factors and Business Performance of Manufacturing Industry in Indian Context. International Journal of Quality & Reliability Management, 22(3), 256-277

Sudrajat, A. (2011). Pedoman Praktis Manajemen Perawatan Mesin Industri. Refika Aditama. Bandung. 56.

Sunaryo, & Nugroho, E. A. (2015). Teknoin. Kalkulasi Overall Equipment Effectiveness (OEE) untuk Mengetahui Efektivitas Mesin Komatzu 80TT. 21(4), 225–233.

Supriyadi, S. & Riskiyadi. (2016). Penjadwalan Produksi IKS-Filler pada Proses Ground Calcium Carbonate Menggunakan Metode MPS di Perusahaan Kertas, SINERGI. Jakarta.

Wijaya & Sesnsuse. (2011). Analisa Perawatan Mesin Produksi, Yogyakarta.

Puspitasari, B. N., & Bagas, A. (2015). Efektivitas. Perhitungan Nilai Overall Equipment Effectiveness (OEE) Mesin Mixer Banburi 270 L dan Mesin Bias Cutting Line 2, 10(1), 42-50.

Riyanto, B. (2001). Dasar-Dasar Produksi. Edisi keempat. Yogyakarta: BPFE.

Mukhril. (2014). Penerapan pada Industri Total Productive Maintenance dan Total Quality Management.

Tangerang: Mega Karya.

Shahin, A., & Attatpour, M. R. (2011). Developing Decision Making Grid for Maintenance Policy Making

Based on Estimated Range of Overall Equipment Effectiveness. Modern Applied Science,5(6),P86-89.

Downloads

Published

2023-02-01

How to Cite

Sitorus, H., Sinaga, Z., & Islam, S. (2023). Analysis Of Overall Equipment Effectiveness (Oee) And Determining Six Big Losses To Increase The Effectiveness Of Lb 02 Lath. METALIK : Jurnal Manufaktur, Energi, Material Teknik, 1(2). https://doi.org/10.22236/metalik.v1i2.10159